Réhabilitation de la salle communale

Réhabilitation de la salle communale
Written by Antony Templier

Built in 1993, the town hall of Noyant-et-Aconin is in need of heavy rehabilitation work: asbestos removal, improvement of use, thermal renovation. The work includes keeping a toilet block and kitchen and rebuilding the hall and its annexes with some improvements in terms of use. The metal structure of the room is preserved and the […]

Eckdaten

Ort:Noyant-et-Aconin Fertigstellung:2018-04-27 Bauweise:Straw infill in a load-bearing box Zimmerer:Fossé Olivier (Fossé SA) Besichtigung:Nein Pressebilder:Nein
Wohnnutzfläche:290m2 U-Wert (Wand):W/m2K U-Wert (Dach):W/m2K Kategorien: Projects France,

Built in 1993, the town hall of Noyant-et-Aconin is in need of heavy rehabilitation work: asbestos removal, improvement of use, thermal renovation. The work includes keeping a toilet block and kitchen and rebuilding the hall and its annexes with some improvements in terms of use. The metal structure of the room is preserved and the walls and roof are rebuilt in wood-framed boxes and filled with straw bales. The foundations will also be insulated by a peripheral insulation. The distribution of openings is modified following a bioclimatic approach and u […] […]

About the author

Antony Templier