Construction.905

Construction.905
Written by Antony Templier

Post and beam house with the north wall in CST, Limousin Douglas timber cut on site.

Eckdaten

Ort:Lugos Fertigstellung:2020-04-04 Bauweise:Straw infill in braced load-bearing structure Besichtigung:Nein Pressebilder:Nein
Wohnnutzfläche:79m2 U-Wert (Wand):W/m2K U-Wert (Dach):W/m2K Kategorien: Projects France,

Post and beam house with the north wall in CST, Limousin Douglas timber cut on site.

About the author

Antony Templier