This straw construction project is multiple: it includes a thermal insulation from the outside (straw between uprights), an elevation (wooden frame with straw filling) and an extension (straw carrier compressed by the funicular form). Here we will only talk about the extension part.

Eckdaten

Ort:Marly-le-Roi Fertigstellung:2013-12-20 Bauweise:Large load-bearing straw bales Besichtigung:Nein Pressebilder:Nein
Wohnnutzfläche:50m2 U-Wert (Wand):W/m2K U-Wert (Dach):W/m2K Kategorien: Projects France,

This straw construction project is multiple: it includes a thermal insulation from the outside (straw between uprights), an elevation (wooden frame with straw filling) and an extension (straw carrier compressed by the funicular form). Here we will only talk about the extension part.