Construction.285

Construction.285
Written by Antony Templier

Extension of a pavilion on 2 levels and insulation from the outside of a gable wall of the existing construction. In the following data, the part described will be the extension. However, here is some information on the thermal insulation from the outside: wood frame added, small boots on field and strapped, lime coating.

Eckdaten

Ort:Herblay-sur-Seine Fertigstellung:2012-04-01 Bauweise:Straw infill in braced load-bearing structure Besichtigung:Nein Pressebilder:Nein
Wohnnutzfläche:60m2 U-Wert (Wand):W/m2K U-Wert (Dach):W/m2K Kategorien: Projects France,

Extension of a pavilion on 2 levels and insulation from the outside of a gable wall of the existing construction. In the following data, the part described will be the extension. However, here is some information on the thermal insulation from the outside: wood frame added, small boots on field and strapped, lime coating.

About the author

Antony Templier